Here's the why.


I've also been wanting to do a 5 speed swap into this car,
but have been putting it off until slushbox failure,
but that didn't happen, this did.
The two options I'm considering:
1- change motors and do the 5 speed swap all at once
or
2 - head gasket replacement and leave all else as is.
If I go with option 1,
what are you thoughts as to what I should do to the other motor before installing,
other than the water pump, the timing belt and associated parts?
All I know about the other motor is that it ran when we pulled it.
Don't know the mileage,
but IIRC the broken odometer showed 198K and came without any service records,
so not certain of internal condition.
Thanks for any and all comments.
Looks like the E12 goes back into service without getting to the body work.